Districtwide Truck Safety Enforcement Plan
|
This Truck Safety Enforcement Plan was created to help the District improve compliance with truck weight regulations.
The purpose was to develop a Districtwide truck safety enforcement plan that identifies safety concerns regarding truck
operations in the city and assesses the economic impacts of overweight/oversize vehicles. The study estimated that
overweight trucks are the source of damage worth about $20 million each year to District’s pavements and bridges.
|
|
Strategic Highway Safety Plan (SHSP)
|
KLS developed the SHSP for the District of Columbia. This collaborative effort involved participants from
7 DC agencies. This comprehensive, 20-year strategic safety plan formulates
the framework for advancing the District's safety activities and establishes a new
direction for the District's transportation system.
|
|
SHSP Action Plan
|
KLS used the SHSP plan to develop 10 action plans; each action area was identified with its own
performance measures. The detailed action plans are now in the design process.
Estimated implementation cost is $50M.
|
|
Work Zone Safety and Mobility Policy
|
KLS developed the work zone safety and mobility guidelines in accordance with the SAFETEA-LU legislation.
Guidelines developed include:
-
District-level process and procedures to assess and manage the impacts.
-
TMP guidelines/criteria.
-
Design checklists and inspection reports.
-
Training.
|
|
Traffic Records Strategic Plan
|
KLS developed the TRS plan mandated by the new SAFETEA-LU legislation. This coordinated/integrated
IS plan will improve traffic records collection, analysis, and reporting. Estimated plan projects cost is $17M.
|
|
New York Avenue Bridge
|
KLS conducted constructability review(s) as well as extensive field investigations in developing the Transportation
Management Plan (TMP) for New York Avenue Bridge over CSX. The TMP involved numerous projects:
-
Resurface/Rehabilitate of Brentwood Road.
-
Replace of 9th Street Bridge.
-
Rehabilitate of New York Avenue Bridge.
-
Traffic Safety Improvements.
-
Reconstruction of First Street NE.
Estimated construction cost is more than $100M.
|
|
11th Street Bridges SE
|
KLS is part of the 11th Street Project Design / Build Team. The estimated cost $265M and when
completed will allow better regional connections and provide drivers with easy accessibility to
neighborhoods, historic areas, parks and interstates. The Transportation Management Plan (TMP)
as being developed by KLS addresses Maintenance Of Traffic (MOT), Traffic Operations (TO) and
Public Information (PI).
|