Whether at the national, state, metropolitan, county or municipal
level, KLS brings a comprehensive, multi-disciplined problem solving approach to
every client. KLS helps develop and deploy strategies designed to mitigate recurring
and non-recurring congestion, improve day-to-day operations and promote an efficient,
safe, and secure intermodal transportation system.
Planning services offered
|
Operational services offered
|
-
Multi-modal Transportation Plans.
-
Asset Management.
-
Corridor Studies.
-
Transportation Policies Studies.
-
Transit Planning.
-
Non-Motorized Transportation Plans.
-
Access Management.
-
Transit-Oriented Design.
-
Traffic Calming.
|
-
Corridor Management.
-
Transit Operations.
-
Street Lighting Analysis.
-
CV Operations / WIM.
-
Work Zone Management.
-
Complete Streets.
-
Asset Management.
-
Evacuation / Emergency Planning.
-
Risk Management / Assessment.
-
Demonstration / Evaluation.
-
HSIP Program.
|
|
|
DDOT East Capitol Street Pedestrian Safety Design Project
|
This project examined the existing and future traffic, transit, and pedestrian and bicycling conditions to improve
pedestrian safety and access as related to street crossings, transit stops, sidewalks, and traffic calming along
East Capitol Street Corridor between Stoddert Place and Southern Avenue. KLS also conducted a comprehensive ADA
assessment for 3.8 miles of sidewalk covering over 100 curb ramps and 16 intersections for APS, pedestrian signal timing, etc.
KLS provided design recommendations consistent with the DDOT Master Plan. We also worked in close connection with the community
and DDOT to address project concerns. KLS is also undertaking all project roadway design, including four (4) new intersections
inclusive of traffic signals and other ITS systems such as HAWK and Rapid Flash beacons, new curb and gutter, signing and marking,
upgrading pedestrian amenties to ADA requirements, landscaping (inclusive of LID designs as applicable), drainage/hydraulic to improve
water flow, additional parking lanes, new bike lanes, and required MOT. The corridor design is intended to significantly improve safety
and mobility and provide the residents with an improved quality of life.
|
|
Norfolk LRT
|
KLS conducted safety reviews (including non-motorized accommodations)
on all stages of design including roadway, track and stations.
Project consists of 11 miles, 10 stations. Cost estimated at $288M.
|
|
Georgetown Transportation Study
|
KLS examined existing transportation conditions (all modes)
in the study area, and completed traffic and various safety analysis as part of
a team. Recommendations covered short, mid and long term. Cost estimated at $10M.
|
|
New Hampshire Avenue Transportation Calming Study
|
KLS investigated existing transportation conditions (all
modes) along New Hampshire Avenue and surrounding areas with the goals to enhance safety, reduce speeding
and promote mass transit and pedestrian safety. Implementation cost estimated at $10M.
|
|
Mt. Pleasant Transportation Study
|
KLS examined the existing and future traffic conditions in
the study as part of a team. Recommendations were made to enhance the efficiency of all modes of transportation.
Special issues addressed include bicycle, pedestrian, and transit needs. Implementation
cost estimated at $5M.
|
|